The painter is working hard ...
The floors are getting ready to be refinished ...
And the BWI team is standing by to put this house back together ...
Here are a few pictures to show you what we have been working on for the last month!  We hope to have "finished pictures" and this house on the market by mid-January!  Stay tuned ...
Friday, December 28, 2012
Monday, November 12, 2012
Vrain - Preliminary Design
We are working with a local architect to prepare design/construction drawings for the Vrain project.  Here is a very preliminary rendering of the finished product.  
Monroe - Under Construction
Since we rented the house back to the sellers for a couple of weeks, the start of construction has been slow.  However, we made great headway last week.  The demo is mostly complete, new walls are framed, cabinets and flooring ordered ... 
Watch here over the next couple of weeks for updates on the progress!
Many thanks to our demo crew for their very hard work last week!
Monday, October 15, 2012
Monroe - Purchase Closed
We closed on the Monroe project Friday morning. It was a lovely closing.
We purchased the home from a couple in their 80s that have decided to move to something that is easier to maintain ... a loft in Lowry ... they are happy that they can walk to the grocery store and the local Tavern.
They are also happy that we are going to do the improvements to their home that they don't have the energy to do ...
I will look forward to showing them the finished project in January
 before they leave for a winter in Arizona!
We will begin construction in 2 weeks - watch here for updates!
Wednesday, September 26, 2012
3270 Vrain Street
We have gone under contract on another new and exciting project.  Once again, this project has a little different twist than the projects we completed this past summer.  This home is an existing duplex located in the Highlands neighborhood.  Our plan is to add a second story ("pop the top") and then sell each side separately.  We are scheduled to close at the end of November and hope to begin construction in the new year.
For more information about the HIghlands neighborhood, follow this link for a
recent article in the 5280 Magazine.
http://www.5280.com/magazine/2012/05/denver-real-estate-2012
Watch here for updates ...
For more information about the HIghlands neighborhood, follow this link for a
recent article in the 5280 Magazine.
http://www.5280.com/magazine/2012/05/denver-real-estate-2012
Watch here for updates ...
Sunday, September 16, 2012
3031 S. Monroe Street
We have gone under contract on our next project.  This is a little different than our others ... although it needs lots of interior improvements, the home is overall in good shape!  We will close and begin work at the end of October.  Watch here for updates ...
Glencoe Street SOLD!
Monday, August 20, 2012
Glencoe - Under Contract
Just a quick update ... the Glencoe Street property went under contract early last week.  The inspection went through without a hitch and we are scheduled to close mid September.  Stay tuned for more updates on the closing and future projects!
Thursday, August 9, 2012
Glencoe - ON THE MARKET
Glencoe will be placed "officially" on the market this weekend.  Enjoy the pictures of the finished product!
  
Dexter Street SOLD
We closed yesterday on the Dexter Street home.  Joe and I particularly enjoyed this project and the style of this home.  It was also our first project completed this calendar year.  Once again, we thank each of you for the part you played in this project and helping us jump back into the real estate world.
The scope of work included adding 128 sf to the home, a new 2 car garage, landscaping and irrigation, new Kitchen, 3 new baths, infrastructure upgrade - plumbing, electrical, etc., and complete cosmetic remodel.
The scope of work included adding 128 sf to the home, a new 2 car garage, landscaping and irrigation, new Kitchen, 3 new baths, infrastructure upgrade - plumbing, electrical, etc., and complete cosmetic remodel.
Saturday, August 4, 2012
Dexter Street Update
We are under contract on the Dexter Street property. 
If all goes as planned, we will close later this week.
If all goes as planned, we will close later this week.
Watch here for updates!
Pearl Street SOLD!
Tuesday, July 3, 2012
Pearl Street - Under Contract!
The Pearl Street property was finished up and went under contract in the last week.  
We will have the inspection and the buyers will obtain their loan approval in the next week or so.  
If all goes as planned, we will close on this property in the beginning of August.  
Below are some of the final pictures:
Thanks again to everyone who helped us on this project!
Friday, June 15, 2012
Pearl - week 8 and 9
We are in the final stages of the project on Pearl.  Over the past couple of weeks, we have put the house back together.  Next week, we will finish the garage and landscaping before putting the home on the market.  Here are a couple preliminary pictures ... stay tuned for the professional ones ...
Glencoe - Week 5
Monday, June 4, 2012
Pearl - week 7
Glencoe - week 3
We are still working on tearing this house up so that we can put it back together again ...
| The rear porch/carport was torn off and "thrown away" - Joe and Bartolo slept great that night! | 
| The underground plumbing was installed in the basement for the new bathroom | 
| The paneling and carpet was removed from the first floor of the house - now we can see if all of these hardwood floors can be refinished! | 
Sunday, May 27, 2012
Dexter - On the Market!
The work at Dexter was wrapped up this week.  The For Sale sign went up and now we wait for the perfect buyer.  Here are the kids this morning before we showed them the final product ...
A full tour of the home can be found at:
Once you click on the link above and the site is opened,
click the “start tour” button 
in the lower right to view the pictures of the
property.
Thanks again to everyone for continuing to support us throughout this project. 
Pearl - week 5 and 6
Work has been quietly progressing at the Pearl Street property over the past couple of weeks.  The drywall was completed, new windows installed, kitchen cabinets put in place and the trim inside and out began ...
Now we finalize all of the finishes and get ready for the painter later this week.
Now we finalize all of the finishes and get ready for the painter later this week.
| Exterior paint colors ... | 
| Kitchen finishes ... | 
Glencoe - week two
This week at the Glencoe St. property, the garage came out of the ground, a new furnace and the new electrical panel was installed.  Now that the boring work is almost complete, we should be able to begin the fun stuff!